Solar company in Thrissur — rooftop installation across Thrissur district — Mastride rooftop solar in Kerala
Thrissur · Cultural capital
Solar company in Thrissur — rooftop installation across Thrissur district
Thrissur · Cultural capital

Solar company in Thrissur — rooftop installation across Thrissur district

Mastride installs grid-tied rooftop solar across Thrissur district — residential villas in Thrissur city, commercial rooftops along Chalakudy NH, coastal homes in Kodungallur, and institutional projects around Guruvayur. KSEB-empanelled, PM Surya Ghar enabled.

  • 600–660 u
    Monthly (5 kW)
  • 78%
    Avg. bill cut
  • 1 week
    Survey
  • All TSR
    Sections

Coverage across Thrissur district

Thrissur city, Ollur, East Fort, Ayyanthole, Chalakudy, Kodungallur, Irinjalakuda, Guruvayur, Kunnamkulam, Wadakkanchery, Chavakkad, Mala, Mukundapuram and surrounding panchayats.

Why Thrissur customers choose Mastride

• KSEB-empanelled across all Thrissur sections • In-house design and install — no subcontracting • Same all-Kerala transparent pricing • PM Surya Ghar subsidy filed and tracked • 25-year panel warranty + 5-year free O&M • Malayalam-speaking project managers

Popular Thrissur configurations

3 kW for 2-BHK: ₹1.02 lakh after subsidy 5 kW for 3-BHK with 2 ACs: ₹2.07 lakh after subsidy 10 kW for villas / small commercial: ₹4.62 lakh after subsidy 25–100 kW commercial: showrooms, schools, hospitals, MSME units

Frequently asked questions

+Does Mastride cover Thrissur?

Yes — all of Thrissur district including the city, Chalakudy, Kodungallur, Irinjalakuda, Guruvayur, Kunnamkulam, Wadakkanchery and Chavakkad. Site survey within a week.

+Thrissur generation?

Average 4.9–5.2 kWh/m²/day. A 5 kW system in Thrissur produces 600–660 units/month with good year-round consistency.

+KSEB sections covered?

Thrissur Electrical Circle: Thrissur, Chalakudy, Kodungallur, Irinjalakuda, Kunnamkulam, Wadakkanchery, Chavakkad sections — all routine for our paperwork team.

+Temples / institutions?

Yes — we've delivered rooftop systems for educational institutions, hospitals and trust-managed properties around Thrissur, including projects with audited tendering and accelerated depreciation.

04 — Run the numbers

See your savings in real time.

Based on the latest KSEB LT-1A domestic tariff (KSERC Order 01.04.2025 – 31.03.2027) — telescopic slabs ≤250 units, non-telescopic above — plus PM Surya Ghar subsidy and ₹3.50/unit net-metering export credit.

Monthly bill4,000
₹500₹10K₹25K₹50K+
300 units / month
Available roof area240 sq ft
80 sqft240 sqft400 sqft800 sqft
3 kW system (~80 sqft per kW)
Estimated generation
405 kWh/mo
Exporting ~105 units back to grid
Monthly savings
₹3,147
Annual savings
₹37,764
Current monthly bill
₹2,331
Bill after solar
₹0
System cost
₹1.6L
PM Surya Ghar subsidy
– ₹78,000
Your net investment
₹87,000
Payback period
2.3 yrs
25-year lifetime savings
₹9.4L
Environmental impact
3,985 kg CO₂ avoided per year — equivalent to planting 190 trees.

* KSEB LT-1A domestic tariff (KSERC Order 01.04.2025 – 31.03.2027). Telescopic ≤250 units (₹3.25–₹8.20); non-telescopic above 250 units flat ₹6.75–₹9.20. Includes 10% electricity duty, fixed charge & meter rent. 4.5 peak sun hrs/day, ₹3.50/unit net-metering export credit. Actual savings depend on site survey.

Lock in these savings
06 — Free site assessment

Stop renting your power. Own it.

Tell us about your property. We'll come over, measure your roof, model your savings and hand you a transparent quote. No commitment.

Act now · Limited grid capacity

Your local KSEB transformer has a fixed solar capacity. Once neighbours fill the quota, new connections are blocked until the government installs a new transformer — which can take months or years. Lock your slot before it's gone.

  • Rooftop suitability & shade analysis
  • Custom system sizing for your usage
  • 25-year ROI projection — exact rupees
  • Subsidy eligibility & KSEB net-metering plan
Free assessment
2 minutes. No commitment.
Slots filling

We respect your privacy. Your details are used only for this quote.